Used
BMW M4
$69798
Mileage
19370
Stock
69798
Transmission
8-Speed Automatic Steptronic
Drivetrain
RWD
Fuel Type
Gasoline
Engine
None
Interior
Black
Exterior
Black Sapphire Metallic
Central Houston Cadillac is proud to present you with another True Market Priced Pre-Owned Vehicle. This 2022 BMW M4 Competition is loaded with the following Factory Options: Driving Assistance Professional Package (Active Driving Assistant Pro and Extended Traffic Jam Assistant), Executive Package (Gesture Control, Head-Up Display, Heated Steering Wheel, Power Tailgate, and Remote Engine Start), Parking Assistance Package (Drive Recorder and Parking Assistant Plus), 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM with 360L, Apple CarPlay & Android Auto Compatibility, Auto High-beam Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW TeleServices, Brake assist, Bumpers: body-color, Carbon Fiber Trim, Compass, ConnectedDrive Services, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Enhanced Bluetooth, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Front Ventilated Seats, Fully automatic headlights, Garage door transmitter, harman/kardon Surround Sound System, harman/kardon® Speakers, Heated door mirrors, Heated front seats, Icon Adaptive LED Headlights w/Laserlight, Illuminated entry, Knee airbag, Leather Shift Knob, Live Cockpit Pro w/Navi, Low tire pressure warning, Lumbar Support, M Compound Brakes w/Red Calipers, M Drive Professional, M Sport Seats, Memory seat, Navigation System, Occupant sensing airbag, Outside temperature display, Overhead airbag, Overhead console, Panic alarm, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Radio: AM/FM Audio System, Rain sensing wipers, Rear air conditioning, Rear anti-roll bar, Rear reading lights, Rear seat center armrest, Rear window defroster, Remote keyless entry, Security system, SiriusXM w/360L, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Split folding rear seat, Spoiler, Sport steering wheel, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Variably intermittent wipers, Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M), and Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver!!Vehicle pricing includes all offers and incentives. Prices are subject to the addition of tax, title, license, fees, and dealer adds. Due to current market volatility, we are pricing and advertising our vehicles immediately following acquisition. All preowned vehicles are reconditioned to make ready for retail sale unless otherwise stated. Residency restrictions may apply. All vehicles come equipped with Cadillac Care. Please see dealer for details and vehicle availability. The team at Central Houston Cadillac would like to welcome you to our dealership on Loop 610 South near NRG Stadium, where we're confident you'll find the vehicles, you're looking for at a price you can afford. Come and check out our full selection of New Cadillac vehicles, or get a great value on a reliable pre-owned model. No matter which vehicle you decide on, our professional finance team will help you get settled with a competitive financing or lease plan.
Would you like to negotiate the price?
Would you like to schedule a test drive?