Used
BMW M4
$56995
Mileage
66286
Stock
56995
Transmission
8-Speed Automatic Steptronic
Drivetrain
AWD
Fuel Type
Gasoline
Engine
None
Interior
Fiona Red/Black
Exterior
Black Sapphire Metallic
Central Houston Nissan is proud to present you with another True Market Priced Pre-Owned Vehicle. This 2022 BMW M4 Competition is loaded with the following Factory Options: Executive Package (Head-Up Display, Heated Steering Wheel, and Remote Engine Start), Parking Assistance Package (Drive Recorder and Parking Assistant Plus), 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM with 360L, Apple CarPlay & Android Auto Compatibility, Auto High-beam Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW TeleServices, Brake assist, Bumpers: body-color, Carbon Fiber Trim, Compass, ConnectedDrive Services, Convertible roof lining, Convertible roof wind blocker, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Enhanced Bluetooth, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Front Ventilated Seats, Fully automatic headlights, Garage door transmitter, Glass rear window, harman/kardon Surround Sound System, harman/kardon® Speakers, Heated door mirrors, Heated Front Seats, Heated front seats, Illuminated entry, Integrated roll-over protection, Knee airbag, Leather Shift Knob, Live Cockpit Pro w/Navi, Low tire pressure warning, Lumbar Support, M Compound Brakes w/Red Calipers, M Drive Professional, M Shadowline Lights, M Sport Seats, Memory seat, Navigation System, Neck Warmer, Occupant sensing airbag, Outside temperature display, Overhead console, Panic alarm, Passenger door bin, Passenger vanity mirror, Power convertible roof, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Radio: AM/FM Audio System, Rain sensing wipers, Rear air conditioning, Rear anti-roll bar, Rear reading lights, Rear seat center armrest, Rear window defroster, Remote keyless entry, Security system, SiriusXM w/360L, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Sport steering wheel, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Variably intermittent wipers, Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M), and Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver!!Central Houston Nissan is more than just your typical car dealership. When our customers visit us, our goal is to provide quality vehicles, exceptional service and a friendly atmosphere. Our staff has been trained to create ease during your purchase or service experience and we are always making sure you get everything you want and deserve out of your visit. Our vision and mission is an employee-centered and customer-focused environment. Vehicles may be subject to prep package and market adjustment. When you buy from Central Houston Nissan, we'll make it the best car buying experience you've ever had. When you purchase a New Nissan or a qualifying Pre-Owned vehicle from Central Houston Nissan, you are automatically enrolled into our Central Houston Nissan Central Care Program at no cost to you. You can’t beat that! Vehicles may be subject to prep package and market adjustment. Stop by 2901 S Loop W, Houston, Texas 77054 today!!!
Would you like to negotiate the price?
Would you like to schedule a test drive?