Used
BMW M3
$44000
Mileage
96709
Stock
44000
Transmission
7-Speed Automatic
Drivetrain
RWD
Fuel Type
Gasoline
Engine
None
Interior
Sakhir Orange/Black
Exterior
Alpine White
Discover the ultimate driving experience with this stunning 2018 BMW M3 Base. Boasting a powerful 3.0L I6 engine and a sleek, eye-catching exterior in a timeless White color, this M3 is ready to take your driving passion to new heights.Highlighted features include:• Competition Package• Navigation System• 16 Speakers• Automatic temperature control• Front dual zone A/C• Exterior Parking Camera Rear• BMW Individual High-Gloss Shadow Line• Lumbar Support Delete• Wheels: 20" x 9" Front/20" x 10" RearSlip behind the wheel and feel the thrill of the road. The M3's responsive handling and dynamic performance will leave you craving more. With a fuel-efficient 17 city/24 highway MPG, you can enjoy the drive without sacrificing efficiency.Elevate your driving experience with the premium amenities this M3 has to offer. The harman/kardon Surround Sound System will immerse you in your favorite tunes, while the Adaptive suspension and Four-Wheel Independent Suspension provide a smooth and responsive ride. Stay connected with the Navigation System and enjoy the convenience of features like Steering Wheel Mounted Audio Controls and Remote Keyless Entry.Safety is paramount, and this M3 delivers with a suite of advanced features, including ABS Brakes, Dual Front Impact Airbags, Dual Front Side Impact Airbags, and Electronic Stability Control. The Active Blind Spot Detection and Brake Assist systems help keep you secure on the road.Designed for the driving enthusiast, this 2018 BMW M3 Base is a true testament to German engineering and performance. With its exceptional features and thrilling driving dynamics, it's the perfect choice for those seeking an unparalleled driving experience. Visit our showroom today to take this remarkable M3 for a test drive and discover the power and precision that only a BMW can deliver.
Would you like to negotiate the price?
Would you like to schedule a test drive?