Used

BMW M5

$113562

Mileage

Mileage

8231

Stock

Stock

113562

Transmission

Transmission

8-Speed Automatic Sport

Drivetrain

Drivetrain

AWD

Fuel Type

Fuel Type

Gasoline

Engine

Engine

None

Interior

Interior

Kyalami Orange/Black

Exterior

Exterior

Black Sapphire Metallic

WE SPECIALIZE IN ALL CREDIT PROFILES! See what we can do for you! Call to find out (626) 899-9302.CARFAX One-Owner. Clean CARFAX.Kyalami Orange/Black w/Extended Merino Leather Upholstery, 18 Speakers, ACC Stop & Go + Active Driving Assistant, Active Driving Assistant Pro, BMW Iconic Glow Kidney Grille, Bowers & Wilkins Surround Sound, Connected Package Pro, Driving Assistance Professional Package, Executive Package, Front & Rear Heated Seats, Front Ventilated Seats, Interior Camera, Navigation System, Parking Assistant Plus, Power Rear Sunshade & Rear Side Window Shades, Wheels: 20" x 10.5" Fr & 21" x 11" Rr M Jet Black.Black Sapphire Metallic2025 BMW M5 AWD 8-Speed Automatic Sport 4.4L V8 Turbocharged DOHC 32V LEV3-SULEV30**********All Pricing and Advertised Prices for any/all vehicles offered for sale does not include dealer installed accessories which can be purchased for an additional cost.********** The Factory Rebates may not be available on this vehicle if you elect to take advantage of a Special Alternative APR or Special Lease program. Some Factory Rebates are California Resident specific and may vary for residents of other states. NO sales to Dealers, Brokers or Exporters. For out of state purchase, customers must be present to purchase. If shipping is required, dealership must facilitate; no exceptions. Please contact us for special Multi-Vehicle or Fleet pricing. Prices are plus government fees and taxes, any finance charges, $85 documentary fee, $29 electronic registration fee, any emission testing charge and $1.75 per new tire state tire fee. *** We make every effort to provide accurate information, but please verify before purchasing. Leasing & financing available on approved credit. Trade-ins accepted. Subject to prior sale.

message

Would you like to negotiate the price?

calender

Would you like to schedule a test drive?