Used
BMW M5
$86995
Mileage
45532
Stock
86995
Transmission
8-Speed Automatic Sport
Drivetrain
AWD
Fuel Type
Gasoline
Engine
None
Interior
Silverstone Full
Exterior
Special Order Color
FACTORY WARRANTY, FRESH OIL CHANGE, NEW FILTERS, NEW WIPERS, 4D Sedan, 4.4L V8 Turbocharged DOHC 32V LEV3-ULEV125 600hp, 8-Speed Automatic Sport, AWD, Active Park Distance Control, Alloy wheels, Apple CarPlay & Android Auto Compatibility, Competition Package (7MA), Connected Package Pro, Dual front side impact airbags, Exterior Parking Camera Rear, Front dual zone A/C, harman/kardon Surround Sound System, Heads-Up Display, Memory seat, Navigation System, Overhead airbag, Passenger door bin, Soft-Close Automatic Doors, Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr Black.Clean CARFAX.CARFAX One-Owner.
Would you like to negotiate the price?
Would you like to schedule a test drive?