Used

BMW M3

$87889

Mileage

Mileage

9183

Stock

Stock

87889

Transmission

Transmission

8-Speed Automatic Steptronic

Drivetrain

Drivetrain

AWD

Fuel Type

Fuel Type

Gasoline

Engine

Engine

None

Interior

Interior

Black

Exterior

Exterior

Alpine White

Priced below KBB Fair Purchase Price!FACTORY WARRANTY, FRESH OIL CHANGE, NEW FILTERS, NEW WIPERS, NEW BATTERY, M3 Competition, 4D Sedan, 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 543hp, 8-Speed Automatic Steptronic, AWD, 16 Speakers, Alloy wheels, Apple CarPlay & Android Auto Compatibility, Compass, Connected Package Pro, Exterior Parking Camera Rear, Front dual zone A/C, harman/kardon Surround Sound System, harman/kardon® Speakers, Heated front seats, Knee airbag, Low tire pressure warning, Lumbar Support, M Sport Seats, Memory seat, Navigation, Navigation System, Overhead airbag, Power Front Seats, Remote keyless entry, Spoiler, Wheels: 19"x9.5" Fr.&20"x10.5"Rr. M Bi-color (1T8).CARFAX One-Owner.

message

Would you like to negotiate the price?

calender

Would you like to schedule a test drive?