Used
BMW M4
$76495
Mileage
6799
Stock
76495
Transmission
8-Speed Automatic Steptronic
Drivetrain
AWD
Fuel Type
Gasoline
Engine
None
Interior
Black
Exterior
Black Sapphire Metallic
Priced below KBB Fair Purchase Price!BELOW AVERAGE ODOMETER, FRESH OIL CHANGE, NEW FILTERS, NEW WIPERS, M4 Competition, 2D Coupe, 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hp, 8-Speed Automatic Steptronic, AWD, Alloy wheels, Compass, ConnectedDrive Services, Enhanced USB/Bluetooth Plus Smartphone Integration, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front dual zone A/C, harman/kardon Surround Sound System, Heated Front Seats, Heated front seats, Knee airbag, Low tire pressure warning, Lumbar Support, M Sport Seats, Memory seat, Navigation System, Power Front Seats, Rear anti-roll bar, Spoiler, Sport steering wheel, Tachometer, Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M).For help with any Vehicle needs please call us directly at 951-621-1288.Clean CARFAX.CARFAX One-Owner.
Would you like to negotiate the price?
Would you like to schedule a test drive?