Used

BMW M3

$80124

Mileage

Mileage

22653

Stock

Stock

80124

Transmission

Transmission

8-Speed Automatic Steptronic

Drivetrain

Drivetrain

RWD

Fuel Type

Fuel Type

Gasoline

Engine

Engine

None

Interior

Interior

Fiona Red/Black

Exterior

Exterior

Black Sapphire Metallic

Priced below KBB Fair Purchase Price!FACTORY WARRANTY, M3 Competition, 4D Sedan, 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hp, 8-Speed Automatic Steptronic, Active Driving Assistant Pro, Driving Assistance Professional Package, Executive Package, Extended Traffic Jam Assistant, Gesture Control, Head-Up Display, Heated Steering Wheel, Navigation System, Power Tailgate, Remote Engine Start.Type your sentence here.Clean CARFAX.

message

Would you like to negotiate the price?

calender

Would you like to schedule a test drive?