Used

BMW M4

$54371

Mileage

Mileage

72713

Stock

Stock

54371

Transmission

Transmission

8-Speed Automatic Steptronic

Drivetrain

Drivetrain

RWD

Fuel Type

Fuel Type

Gasoline

Engine

Engine

None

Interior

Interior

Black

Exterior

Exterior

Gray Metallic

The Price you See is the Price you pay !!! No Games no Forced extras. Transparency is key , come see us for your next car.This 2021 BMW M4 Competition in Brooklyn Grey Metallic delivers impressive performance with a 3.0L turbocharged inline-six engine producing 503 horsepower. The eight-speed automatic Steptronic transmission and rear-wheel drive provide responsive handling and driving engagement. With its aggressive styling, premium appointments, and track-ready capability, this M4 Competition stands out as a serious driver's car.Key Features:- Parking Assistant Plus with Drive Recorder- Navigation System with Live Cockpit Pro- Harman/Kardon premium surround sound- M Sport Seats with extended Merino leather upholstery- Heated front seats with power adjustment- 19" x 9.5" front / 20" x 10.5" rear Orbit Grey wheels- Adaptive suspension with four-wheel independent setup- BMW Assist eCall emergency communication- Auto-dimming Rear-View mirror- Speed-sensitive steering and adaptive headlightsThe M4 Competition combines luxury and performance seamlessly. Its meticulously designed interior features premium leather seating, advanced infotainment, satellite radio, and comprehensive connectivity through BMW's ConnectedDrive Services. Multiple airbags, electronic stability control, rear parking camera, and emergency braking assist ensure safety throughout your drive.Visit us today to experience the precision engineering and exhilarating performance of this BMW M4 Competition firsthand.

message

Would you like to negotiate the price?

calender

Would you like to schedule a test drive?