Used
BMW M4
$74773
Mileage
11210
Stock
74773
Transmission
8-Speed Automatic Sport
Drivetrain
AWD
Fuel Type
Gasoline
Engine
None
Interior
Black
Exterior
Gray Metallic
The Price you See is the Price you pay !!! No Games no Forced extras. Transparency is key , come see us for your next car.- Icon Adaptive LED Headlights w/Laserlight- M Shadowline Lights- Active Driving Assistant Pro- Extended Traffic Jam Assistant- Parking Assistant Plus- BMW Curved Display w/HUD- Remote Engine Start- Heated Steering Wheel- Carbon Fiber Trim- M Sport Seats with Extended Merino Leather Upholstery- Heated Front Seats- harman/kardon Surround Sound System with 16 Speakers- Drive Recorder- Navigation System- SiriusXM with 360LThis 2024 BMW M4 Competition in Gray delivers the performance and sophistication you expect from BMW's most celebrated performance sedan. Powered by a 3.0L turbocharged inline-six engine producing 503 horsepower, this vehicle achieves 16 city and 23 highway MPG with all-wheel drive capability and an 8-speed automatic Sport transmission. With just 11,210 miles, this Competition model presents an exceptional opportunity to own a nearly new performance machine.The M4 Competition combines athletic design with refined engineering. The Gray exterior is complemented by premium features including M Shadowline Lights and Icon Adaptive LED Headlights with Laserlight technology for striking presence on any road. The 19" and 20" forged M light-alloy wheels in silver showcase the vehicle's purposeful stance, while M Compound Brakes with red calipers provide the stopping power expected from a true performance vehicle.Inside, the M4 Competition prioritizes driver engagement and comfort. Extended Merino leather upholstery wraps M Sport Seats with power adjustment and heating, while a heated steering wheel ensures comfort in any season. The sport steering wheel puts control at your fingertips, and the BMW Curved Display with Head-Up Display keeps essential information in view. The harman/kardon Surround Sound System with 16 speakers and SiriusXM with 360L keeps you entertained throughout your drive.This Competition model includes comprehensive technology packages designed to enhance your driving experience. The Driving Assistance Professional Package features Active Driving Assistant Pro and Extended Traffic Jam Assistant, while the Parking Assistance Package adds Parking Assistant Plus for confident maneuvering. The Executive Package provides convenient features like Remote Engine Start and navigation seamlessly integrated into the curved display design. A Drive Recorder captures your journeys, and ConnectedDrive Services keep you connected on the road.Safety systems and driver assistance features work together to protect you and your passengers. Dual front and side impact airbags, knee airbags, and integrated roll-over protection form the foundation of the M4's safety architecture. Electronic Stability Control, adaptive suspension with four-wheel independent design, and speed-sensing steering provide responsive handling while maintaining security.Premium conveniences throughout the cabin enhance daily driving. Rain-sensing wipers, auto-dimming mirrors, illuminated entry, and a garage door transmitter address practical needs. Climate control includes automatic temperature management with front dual-zone operation and rear window defrost. The convertible roof lining and power convertible roof add to the dynamic nature of this performance machine.This M4 Competition represents a rare opportunity to acquire a high-performance BMW in near-new condition. The combination of thrilling performance capability, comprehensive technology, and premium materials creates a vehicle that rewards both daily driving and spirited weekend excursions. We invite you to schedule a test drive and experience firsthand why the M4 Competition remains one of the most sought-after performance sedans available.
Would you like to negotiate the price?
Would you like to schedule a test drive?